FAQs

There are several variables that effect the price of your new epoxy floor:

  • Square ft. of floor to be covered
  • Is the floor currently painted or do we need to remove an old epoxy system
  • Condition of the concrete……are there severe stains or repairs needed
  • Will we need to cut control joints to divide rooms or areas
  • What products will we need to use. We offer a wide variety of coatings to insure we provide the right coating for your application.
  • Please give us a call to schedule an appointment and we’ll be happy to provide a detailed quote.

The length of time to complete your project will depend upon the coating you choose. It can be as fast as 1 day or take several days to complete.  If you have time constraints, please discuss with our sales staff and they’ll be happy to help.  In general though, it’s a 1-2 day process and you’ll need to allow at least 24 hours before walking on your new floor.  Also, we recommend at least 48 hours before driving on your new floor.

  • We take great care to protect your home or business. Generally the messiest part of the process is the concrete grinding which generates dust.  To minimize the mess we use a sophisticated dual motor Hepa vac which is attached to the grinding system.  If there are other sensitive areas we will mask and encapsulate them.
  • We also clean around the project site to leave it as nice as possible
  • We respect your home!

We use a high performance diamond grinder to resurface your floor and provide the proper profile. Diamond grinding and shot blasting are the only options that provide a proper profile and insure adhesion of your new epoxy floor.  This is the industry standard.  We do not use an acid wash.

We accept all major credit cards, checks, and cash.

Our Process

How it works

01

Connect with us

Call Topshelf Coatings LTD to schedule a sales professional

02

meet an expert

Meet with one of our professionals to discuss flooring options. Look for potential issues. Receive a quote.

03

installation

One of our qualified installation techs will install the floor of your dreams.

04

curing process

Allow 24 hours before walking on new floor and 48 before parking on it.

Provide you the Highest Quality Work that Meets your Expectation